TOWER REPLACEMENT & REPAIR PROJECTS
High Rise Office Building, Washington, DC
This project required the existing systems to be removed, replaced and put back into service over a time frame of one weekend in order to meet tenant requirements. Included was the installation of three indoor stainless steel Evapco cooling towers, the associated variable frequency drives, and air discharge duct, valves, piping and insulation.
See More Project Images >
High Rise Office Building, Vienna, VA
Included the installation of two stainless steel Evapco cooling towers, the associated structural steel, vibration isolation, valves, piping, insulation, solids separator system, and variable frequency drives. The project required the existing systems to be removed, replaced and put back into service over a time frame of one weekend in order to meet tenant requirements.
High Rise Office Building, Washington, DC
Included the installation of an Evapco model ATW Closed Circuit Cooler, the associated structural steel, vibration isolation, valves, piping, insulation, MCC, pneumatic air tank and variable frequency drives.
Multi-Family High Rise Complex, Alexandria, VA
This project included the installation of three stainless steel Evapco cooling towers, the associated structural steel, vibration isolation, valves, piping, insulation, and required engineered drawings. All work was completed on a limited time frame with a three day turnaround.
See More Project Images >
|
|